Programs
Connect product decisions, delivery plans, readiness evidence, and launch follow-through.
Start here: create a program, plan a launch, and track delivery
A program coordinates a product introduction, change or discontinuation. Start with a launch goal, build a realistic plan, agree the next team cycle, and verify readiness. Proposed plans do not approve production or launch. You do not need to fill in every section at once.
- Define the programSelect New program. Describe the outcome, product version, site and market. Choose an owner, sponsor and process path. NIV provides the corresponding readiness checklist.
- Plan backward from launchOpen Program manager and choose Plan backward from launch. Enter the launch target, available start date, prototype count, owners and task estimates. Preview conflicts before saving proposed activities and milestones. Check the Timeline afterward.
- Plan the next cycleIn Planning, set the cycle dates, add measurable objectives, enter available hours, and assign capacity. Record dependencies and risks before agreeing the plan.
- Track work and evidenceIn Program operations, assign owners, record supplier commitments and meeting actions, and attach originals to saved records. In Readiness, submit current evidence; a different authorized reviewer checks it. Clear the listed blockers.
- Review, launch, follow upUse Readiness and Stages for evidence-based decisions. Record actual launch events only when permitted. Verify required follow-ups and complete the handover before archiving the program.
- Planning cycle
- A time-boxed period of agreed team work. It does not grant permission to launch.
- Objective
- A measurable result the team intends to achieve, with an owner, date and acceptance criteria.
- Dependency
- Something another team or program must provide. Delivery and acceptance are separate steps.
- Target / forecast / actual
- The requested date, latest estimated date, and confirmed date the event happened. They remain separate even when plans change.
- Readiness blocker
- A condition still preventing a decision, such as missing evidence or an unresolved dependency. Read its message before proceeding.
- Supporting documents
- Readiness links an existing permitted source record; linking is not a new file upload. Open a saved Program operations record to attach, scan, preview and download original files. An upload never grants approval.
- Launch plan
- A backward schedule from your desired launch date. It proposes work, prototypes and dates; verify assumptions and owners before accepting commitments.
- Prototype
- A planned build and test cycle. A failed build remains blocked until its test result, learning and passing retest evidence are verified.
- Partner commitment
- A supplier or external stakeholder promise. A requested date is not confirmation, and a delivered item still needs receiving verification.
Finishing tasks or reaching a planned date does not approve a stage or authorize a launch. Review permissions, accepted evidence and the recorded decision still apply. If a control is unavailable, check the program status and ask your company administrator about your role.
Start by creating or opening a program. Only records available to your current company and role are shown.
How Programs works8 lifecycle stages · Gantt planning · planning intervals · continuous improvement
Choose Introduce a product, Change an existing product, or Discontinue a product when creating a program. Each path retains its own readiness requirements, planning intervals, dependencies, evidence and independent decisions. The schedule tells you when work is expected; the evidence review determines whether you may proceed.
Five connected planning levels
- Product strategy and desired outcomes
- Lifecycle stages and evidence gates
- Master plan, Gantt schedule and milestones
- Planning intervals, capacity and dependencies
- Team work, test results and feedback
Six parallel workstreams
Engineering, suppliers, factory, quality, logistics and service can prepare concurrently. Their verified inputs converge at readiness reviews.
Eight lifecycle stages for each process path
- Need and business opportunity
- Concept and feasibility
- Program scope and responsibilities
- Controlled development and prototypes
- Verification and validation
- Supplier and factory preparation
- Introduction readiness and authorization
- Operating follow-up, learning and handover
Change programs add impact assessment, retesting and cutover controls. Discontinuation programs cover outstanding orders, inventory and supplier obligations, last-order and production-end dates, continuing service and accepted handover.
Gantt schedule and milestones
Open a saved program, then Program manager. Plan backward from launch, set owners, durations, predecessors, holidays and required resources. Preview the Gantt chart before saving; saved plans show calculated work, dependencies, target and latest permissible dates. Update activities using the existing controlled forms.
Target, approved baseline, current forecast and actual completion are different records. A calculated date never means an approval.
Plan, execute, review and improve
Planning intervals coordinate short-term objectives, capacity, commitments and risks. Reviews and demonstrations surface new facts; improvement actions carry owners and independent effectiveness checks. An interval's completion does not authorize product launch.
Link requirements, product configuration, evidence, independent decisions and actual operations without copying another system's authority. Record blockers, supplier delays, version changes and lessons for the next cycle.
Checking your company and loading its programs.