Production Records & Traceability
Trace quantities to the original production observation and its source identifier.
Before you begin: Import or enter validated production observations first.
Engineering: products, documents, and changes in one place.
Start with the product or item. Connect its drawings and materials, then review engineering changes before releasing work to production.
Where output is being lost
What to expect next shift
Learned from each work center's own shifts. NIV shows a forecast only when it beat a simple guess (next shift equals the last one) on recent shifts it had not seen.
1. Add production results
Upload a CSV/Excel file or enter one shift manually. Check quantities before saving. Imports never update inventory or accounting.
Review converted rows or paste CSV data
source_record_id, site_code, work_center_code, product_code, order_ref, production_date, shift, timestamp, planned_units, actual_units, good_units, rejected_units. Timestamps must include an offset; dates must be YYYY-MM-DD. Up to 5,000 rows a file. Add planned_minutes, run_minutes, ideal_cycle_seconds and first_pass_units to get equipment effectiveness and right first time; leave a cell blank when it was not measured. Machines and factory systems can send shifts on their own: create an API key in Team & access and post to /engineering/machine/records (see /developers).
Enter one shift manually
No spreadsheet needed. Enter all four quantities, including rejected units. NIV retains the submission time and source history.
2. Production performance by work center
Attainment: sum of actual units divided by sum of planned units. Bars are visual only; values are never capped.
Source completeness
No imports yet.
Equipment effectiveness is availability × speed × quality, from rows that carry planned minutes, run minutes and ideal seconds per unit. Right first time is units good with no rework divided by units produced.
Downtime by reason
Measured machine stoppage in minutes. Missing event logs are unknown, not zero.
Defects by category
Counts distinct defect occurrences. One rejected unit can contain more than one defect.
Shift calendar
Plan each shift before its day starts. From that day the plan is frozen: production for the shift must match it, so attainment is always measured against what was promised. Planned minutes here are used when a file or machine does not send them.
Reject rate trend by production date
Rejected finished units divided by produced units each day. This never uses defect-occurrence counts.
3. Production records behind the numbers
Use a source record to log machine downtime, observed defects, or an improvement issue.
4. Problems, assigned actions, and verification
Closure requires a different qualified reviewer, a later comparable production record, measured improvement and written evidence.