Engineering
One place for Product Engineering (PLM, BOM and part revisions), Production Engineering (shift logs, downtime and quality performance), and verified corrective work. Select a familiar task below.
Loading your permitted Engineering tools…
Product Engineering & BOM
Product design, drawings, Bill of Materials (BOM), parts and change follow-up. These links open existing authorized NIV tools.
Design calculations
Production Reporting & Data
Production Performance & Quality
Corrective Action & Verification
Access & Records
Engineering Feature Checklist
Standard manufacturing names, current scope, and the work needed for a complete Engineering workspace. "Available" means NIV supports the workflow, not that your company has provided complete data or passed its own signed-in acceptance.
Available features and remaining work
| Manufacturing feature | Status | What this means |
|---|---|---|
| Product Lifecycle Management (PLM) & BOM revisions | Available | Existing product programs, drawing records and BOM revision workflows. |
| Product structure, configuration & where-used | Draft | Product Atlas permits draft inspection; a preview is not an approved released BOM. |
| Shift Production Log & CSV / Excel import | Available | Source-linked, reconciled production observations with company role checks. |
| Plan vs. Actual Output & production KPIs | Available | Attainment and reject rate from validated discrete-unit observations. |
| Machine Downtime & Pareto | Available | Logged stoppages by reason; unreported downtime is not automatically zero. |
| Defects, Rejects & Quality Trends | Available | Defect occurrences and rejected finished units are separately measured. |
| Corrective Actions & Effectiveness Verification | Available | Issue ownership, investigation, action evidence and independent result review. |
| Audit Trail, Access Control & Data Export | Available | Company-scoped source history, role permissions and authorized exports. |
| Production Data Corrections & Revision History | To build | Approved, versioned corrections must preserve the prior source observation. |
| Shift Calendar & Frozen Production Plan | To build | Define shifts, plant calendars, approved targets and schedule adherence. |
| Complete Event Reporting & Shop-floor Validation | To verify | Check plant reporting coverage, real work-center adoption and signed-in customer acceptance. |
| Design Change | To finish | Connect controlled approvals, released BOM revisions and downstream effect checks. |
| Overall Equipment Effectiveness (OEE) & First Pass Yield (FPY) | To build | Requires planned run time, ideal cycle time, first-pass and rework measurements. |
| Statistical Process Control (SPC) & Process Capability (Cp/Cpk) | Future | Needs validated measurement series, sampling plans and control-limit rules. |
Production Performance uses discrete-unit observations. It does not operate machines or post inventory or accounting transactions. Open the complete Production Performance workstation.